Pula
/ 57 m2
/ 201,000 €
- Štinjan
Ad you looking for is not active.
Try to find other listings using search engine powered by www.nadjidom.com
Related Searches:
Similar ads
303,050 €
Flat
94 m2
Pula, Štinjan, spacious apartment in a new building in a great location
Štinjan, Pula
- 94 m2
- 2.0
09/10/24
In Štinjan, in an excellent location, close to all amenities and the city beach Hidrobaza, multiple apartments are for sale in a new project.
Construction of the building will begin in June 2024, with completion and move-in expected by June 2025.
It consists of three above-ground floors, with a structure of P+2.
The apartment K4 is located on the second floor of the residential building. It...
147,200 €
Flat
42 m2
Štinjan, one-room apartment on the ground floor of a new building, parking,...
Štinjan, Pula
- 42 m2
- 1.0
09/10/24
Apartments for sale under construction in a residential building with 17 apartments located in Štinjan.
The building consists of a ground floor, first, and second floor.
The apartments will be equipped with high-quality ceramics and finishing materials, underfloor heating, electric roller blinds, mosquito nets, and the building will have an elevator.
They are located in an excellent location,...
Advertising
215,000 €
Flat
45 m2
Pula Štinjan, beautifully furnished apartment with parking
Štinjan, Pula
- 45 m2
- 2.0
09/10/24
A furnished one-bedroom apartment is for sale in a quiet location in Štinjan, situated on the first floor of a residential building built in 2023. The apartment is located near the sea and the beautiful beaches of Štinjan and Valbandon, as well as the stunning seaside promenade that stretches from Štinjan through Valbandon and Fažana, all the way to Peroj. It is 5 km away from Pula and only...
182,300 €
Flat
57 m2
Pula, Štinjan, apartment in a new building in a great location
Štinjan, Pula
- 57 m2
- 2.0
09/10/24
In Štinjan, in an excellent location, close to all amenities and the city beach Hidrobaza, several apartments are for sale in a new project.
Construction of the building will start in 06/2024, with completion and occupancy expected in 06/2025.
It consists of three above-ground floors, with a structure of P+2.
The apartment L2 is located on the first floor of the residential building. It has a...
Your ad is currently checking. You will be able to sponsor it once our moderators accept it.
Contact info is not available because the ad is no longer active.